Axle load

When to use?

When planning delivery, it is necessary to take into account the load on the axle of the vehicle.

Scheme

Schema for case

How to implement the script?

  • Break the body into virtual boxes.
  • For each box, describe the limitations, taking into account the axle load.

Example

There are 3 loads of 2000 kg. There is also a vehicle that can carry 6000 kg in total. Due to the limitation of the axle load, the body is divided into 2 boxes of 3000 kg each - that is, all 3 loads cannot be placed in the car at the same time.

When scheduling, only 2 shipments will be delivered. 3 The shipment will not be delivered because it will not fit in the vehicle due to axle load restrictions.